top of page

Bayville Golf Club Construction 

During the winter of 2022 Bayville Golf Club started the process of renovating the course after two years of planning with the Board of Directors and Golf Architect Andrew Green. The course project was to renovate the Tom Fazio designed course which was originally designed in the early 1990's.  The club has always strived to provide its membership with great playing conditions and be a leader throughout the region.  With different playing strategies, cost of managing courses and labor market challenges, this was perfect time and planning for the club's future and sustainability. The renovation started in January and open back to the membership in November to rave reviews by the membership.  Greens, bunkers, irrigation, tee complexes along with Fraize mowing fairways to enhance fairways to provide firmer fairways by reducing heavy thatch layers where all completed during this short stretch of time.  

Greens Drainage Getting installed 

Gravel layer installed over the drainage system in the greens 

Greens mix was added to the greens and Seeding of Pure eclipes Bentgrass was seeded

Successful greens renovation in 6 months 

Details to the Bunkering and playing areas

 Greens were pure and smooth for opening day

New design was created for the fairway cut to enter into the playing edge of the bunker

Par 3 hole 16 was a big change from the back tee with a green surrounded by the Lynnhaven River 

2022 website designed for Anthony Scott Mauldin 804 467-3167

bottom of page